Jingneng Shiyan 2×350MW Supercritical Two-pass Boiler
The power plant is located in Zhangwan District, Shiyan City, Hubei Province. The Project adopts two 350MW Supercritical Two-pass Boilers. Unit1# has been put into production on December 22,2018. Unit 2# will be put into production in February, 2019.
The company has started digestion and absorption of introduced supercritical technology since 2003. Then conducted self-development, technology optimization and undertook lots of supercritical boiler orders. The operation performance is in a leading position in China.
(1) Two-pass arrangement with better safety, reliability, and lower electricity consumption.
(2) Advanced compound air classification low NOx tangential combustion system, high-efficient, environment friendly, with wider coal adaptability.
(3) Reasonable heating surface arrangement and temperature regulation mode with better regulation of steam temperature.
Contact Us
- Shanghai Boiler Works Co Ltd.

Address:No.250 Huaning Road, Shanghai, PRC

Post code:200245

Tel: +86(21)6430 2391

Fax:+86(21)6430 1980