国产丝袜视频一区二区三区,天天操一一爽,中午字幕无码

91啦丨九色丨蚪窝人妻,国产三级无码在线观看,欧美黑人XXXX高潮猛交,少妇人妻好深好紧精品无码

? 2009, Ethiopia Gibe III - Addis Ababa Power Transmission and Transformation Project: LOT1 Substation.
This project is the LOT 1 substation part of Ethiopia Gibe III-Addis Ababa power transmission and transformation project. Its owner is Ethiopian Electric Power Corporation (EEPCo). LOT1 substation project as an important hub for delivering out Gibe III hydropower, consists of two new 400kv substations and expansion of 2 substations, Sabata and Gilgel Gibe II. Our company provided design, procurement, civil work, installation, detection, testing, owner training, and maintain service in guarantee period. The total construction period is 24 months.

This project is the LOT 1 substation part of Ethiopia Gibe III-Addis Ababa power transmission and transformation project. Its owner is Ethiopian Electric Power Corporation (EEPCo).


This project is the LOT 1 substation part of Ethiopia Gibe III-Addis Ababa power transmission and transformation project. Its owner is Ethiopian Electric Power Corporation (EEPCo).

Contact Us
上海電氣輸配電工程成套有限公司
Address:4th Floor,No.1395 Yu Yuan Rd,Shanghai,PRC
Post code:200250
Tel: 8621-52371666
Fax:8621-52378863